|
|
|
|
![]() |
![]() |
![]() |
![]() |
||
![]() |
![]() |
||
|
BIEAP > Project Review > BERC Registry Track 1 > Track 1 Projects - 2000 1. 2000-07-B01: Application by Mr. and Mrs. J. and G. Wilson, 1866 Naomi Place, Deep Cove, North Vancouver BC for the removal of existing deck structure. Related to BERC CPR# 0006B039. 2. 2000-07- B002 - Application by Concord Pacific for a geotechnical investigation in area 4 of False Creek. Related to CPR# 0004B023. 3. 2000-08-B003 - Burrard Yacht Club: proposal to replace 3 small diameter pipe piles at the North Vancouver facility with 1 large diameter pipe pile. VPA letter sent Aug. 8th. 4. 2000-09-B004 - Trans Mountain Pipeline: application for integrity improvements to your existing wooden dock structure at Westridge Pier 59. VPA letter sent Sept. 11th. 5. 2000-09-B005 - Vanterm: application for concrete rubble to be removed from a scow to an onshore site at Berry Point Terminal (related to 0008B051). VPA letter sent Sept. 18th. 6. 2000-09-B006 - Neptune Bulk Terminals: application for modifications for the sheet pile wall & pile cap (related to 9808B085). VPA letter sent Sept. 19th. 7. 2000-09-B007 - Barry Hagglund - application for proposed repairs and upgrades to the existing pool and deck/patio. VPA letter sent Sept. 22nd. 8. 2000-09-B008 - CXY Chemicals Ltd.- Hyack King deck recoat, VPA letter sent September 25, 2000. 9. 2000-09-B009 - Chevron Canada limited - repairs to dolphin in Coal Harbour - VPA letter drafted September 29, 2000 10. 2000-11-B010 - Nickel Brothers House Moving Ltd./ FTI - Application to utilize the foreshore west of New Brighton Park in Vcr. 11. 2000-11B011 - IOCO Refinery - Proof of Concept Project for Hydraulic Barrier at the Ioco Refinery. VPA letter sent Nov. 28th. 12. 2000-11B012 - Lynnterm & Vanterm - flushing & video inspection of storm sewer outfalls. VPA letter sent 13. 2000-12-B013
- Harbour Heliport - inspection of the underside of the floating helipad.
VPA faxed BERC Dec. 12th.
|
|||
![]() |
|
![]() |
|||||